
At
the onset of a Major Incident can you instantly access:
Site Personnel and External Agency contact details?
Documented Emergency Procedures?
Accurate floor plans of the Incident Zone? |

|

|
If you don't have specific, positive answers
to these questions, then your Business is at serious risk. Speed-Tec provides
a step-by-step pre-planned solution to these and other critical issues,
during a Major Incident.
Often, a Business Continuity Plan (BCP) is focused only
on continuing or rapidly restoring business operations after an Event.
Little attention is paid to the critical steps that must be taken during
an emergency.
Speed-Tec is a PC launched, concise, Information Source
specifically aimed at assisting your Emergency Response Team and the Emergency
Services during a Major Incident. |
| Speed-Tec is intended to supplement
and not replace your existing Business Continuity Plan. Applicable to
a wide range of crisis situations, this unique Emergency Planning Package
(EPP) takes the user through a logical information sequence, prioritised
to ensure the Safety of Life, the Protection of the Environment, and the
Preservation of Assets. Only when these goals are achieved, can a BCP
be effective.
|
A stand-alone EPP, Speed-Tec
can be used at any location with an available PC, or operated remotely
by Off Site personnel and the Emergency Services. Instantly access Emergency
Procedures, Site and External Agency Contact details. Zoom to the Incident
Zone using the navigable, interactive Mapping Facility. Show Assets, Hazards,
Fire Equipment, Evacuation Routes, photographs. Talk to colleagues 'through'
Voice Over Internet Protocol (VOIP): All at the click of a mouse |
- 80% of businesses affected by a major incident close within 18 months.
- 90% of businesses that lose data from a disaster are forced to shut
within 2 years.
- 58% of UK organisations were disrupted by September 11th. One in eight
was seriously affected.
- 40% of the businesses affected by the Manchester Bombing never traded
again.
|
 |
|
|
|
|
|