T-Cards and T-Card Boards
Below are some examples of the many T-Card Boards we have manufactured.
YOUR WORK PERMIT YOUR WORK PERMIT
LOGO LOGO
HERE IN OPERATION HERE IN OPERATION
SSL-057-INT - 630mm x 550mm SSL-057-SS - 630mm x 550mm
Internal Work Permit In Operation Board. External Work Permit In Operation Board.
YOUR YOUR BUNK ALLOCATIONS
LOGO PAR T-CARD RACK LOGO
HERE
HERE
ON-BOARD VESSEL ON-BOARD PLATFORM Cabin upper Cabin upper Cabin upper
2-04 lower 2-05 lower lower
Cabin upper Cabin upper Cabin upper
2-06 lower 2-07 lower lower
Cabin upper Cabin upper Cabin upper
2-08 lower 2-09 lower lower
Cabin upper Cabin upper Cabin upper
2-10 lower 2-11 lower lower
Cabin upper Cabin upper Cabin upper
2-12 lower 2-13 lower lower
Cabin upper Cabin upper Cabin upper
2-14 lower 2-15 lower lower
Cabin upper Cabin upper Cabin upper
2-16 lower 2-17 lower lower
Cabin upper Cabin upper Cabin upper
2-18 lower 2-19 lower lower
Cabin upper Cabin upper Cabin upper
2-20 lower 2-21 lower lower
Cabin upper Cabin upper Cabin upper
2-22 lower 2-23 lower lower
Cabin upper Cabin upper Cabin upper
2-24 lower 2-25 lower lower
Cabin upper Cabin upper Cabin upper
lower lower lower
MOVE YOUR T-CARD BEFORE CROSSING PAR AND UPON RETURNING
SSL-249-SS - 1350mm x 820mm SP-1326 - 665mm x 700mm
PAR T-Card Rack Board. Bunk Allocations Board.
DERRICK
YOUR
LOGO T-CARD
MUSTER POINT A MUSTER POINT B MEDICAL CENTRE FIRE STATION COMMAND CENTRE HERE SYSTEM
NORMAL STATUS MUSTERED STATUS
NORMAL STATUS MUSTERED STATUS NORMAL STATUS MUSTERED STATUS NORMAL STATUS MUSTERED STATUS
INSTRUCTIONS
On the Red side, the person must enter his name, date,
time, and tools used for the job.
GREEN SIDE CHECKLIST FOR ENTERING THE DERRICK
VIA ELEVATOR OR WORKBASKET
1) Notify the Driller.
2) Sign in the Derrick Log Book with T-Card #. Print name,
date and time up on the Red side of the card.
3) List all tools to be used for the job in the Log Book and
on the Red side of the T-Card.
4) The Driller must visually confirm all tools that are to be
used.
5) Ensure that all tools are tethered or secured.
6) Is a JSA required?
7) Is a Safety Harness required?
CHECKLIST FOR EXITING THE DERRICK
1) Notify the Driller.
2) Ensure that all tools are accounted for.
3) The Driller must visually confirm that all tools have
been returned.
4) Remove name, date. time and tools from Red side of
T-Card. (Grease pencil or white board marker)
5) Sign out log book and close out PTW if job is finished.