Page 131 - Seaward Safety
P. 131
Informational Boards
YOUR
LOGO FACILITY NAME
HERE
NO DIRTY WORK CLOTHING IS TO BE
WORN IN THE ACCOMMODATION AT
ANY TIME
SSL-232 - 610mm x 406mm
Accommodation Notice/Instruction Board.
Alternate pictographs available on pages 75-97.
YOUR JHA USE
LOGO
HERE DECISION GUIDE
For every job
START HERE
Proceed with job
Could I hurt Could someone Could this job Have we done this at Supervisor's
someone else else hurt me have a negative job safely before & discretion (No
while we are NO while we are NO effect on the NO do we know all of YES JHA required
doing this job? doing this job? environment? the steps by heart? but consider use
of StepBack 5x5)
YES YES YES NO
Complete
a master
Does a master JHA exist for this job? JHA before
NO
doing the job
YES
Using the master JHA, do a JHA review
Decide below
What type of JHA review should we do
(Routine or Detailed)
A routine JHA review includes:
Pre job meeting with all teams involved
Use of Master JHA
Interactive discussion with all involved
Can be led by other team members
Does this job involve other
people beyond our team?
YES A detailed JHA review including
a walkthrough includes:
Pre job meeting with all teams involved
NO Use of Master JHA
Being on-site with hands on equipment
On-site walkthrough of steps for job
Has our team performed this job Interactive discussion with all involved
safely within the past three days?
NO Usually led by a team leader in charge
YES
Has anything changed that could
affect the safe outcome of this job?
YES NO
(new team member, weather etc).
Utilizing the master Utilizing the master
JHA, do a detailed JHA, do a routine
JHA review including JHA review as a
a walkthrough minimum
SSL-244 - A2 (420mm x 594mm) or A3 (297mm x 420mm)
JHA Use Decision Guide Poster/Board.
Used to display Job Hazard Awareness directives using
colour codes to instruct personnel on safe working practise.
131

