Page 137 - Seaward Safety | Supplying Signage Solutions
P. 137

T-Card Boards and T-Cards                                     *  All Boards can be tailored
                                                                     to suit requirements






                YOUR  WORK PERMIT                      YOUR  WORK PERMIT
               LOGO                                    LOGO
                HERE  IN OPERATION                     HERE  IN OPERATION
                                    Pictographs can be
                                    altered to suit your
                                      requirements.
                                     See pages 77-98.






           SSL-056-INT - 630mm x 720mm             SSL-056-SS - 630mm x 720mm
        Internal Work Permit In Operation Board.  External Work Permit In Operation Board.


             YOUR    WORK PERMIT                     YOUR   WORK PERMIT
             LOGO                                    LOGO
             HERE    IN OPERATION                    HERE   IN OPERATION










           SSL-057-INT - 630mm x 550mm             SSL-057-SS - 630mm x 550mm
        Internal Work Permit In Operation Board.  External Work Permit In Operation Board.


           MUSTER POINT B
           MUSTERED STATUS  FIRE STATION
                      NORMAL STATUS  MUSTERED STATUS
                                           YOUR  DERRICK
      MUSTER POINT A  MEDICAL CENTRE  COMMAND CENTRE  LOGO  T-CARD
      NORMAL STATUS                        HERE  SYSTEM
                NORMAL STATUS  MUSTERED STATUS  NORMAL STATUS  MUSTERED STATUS
                                                             YOUR
                                                             LOGO  BUNK ALLOCATIONS
                                                             HERE
                                                             upper  upper   upper
                                                           Cabin   Cabin  Cabin
                                                            2-04  lower  2-05  lower  lower
                                                INSTRUCTIONS  upper  upper  upper
                                             On the Red side, the person must enter his name, date,   Cabin  lower  Cabin  lower  Cabin  lower
                                                            2-06
                                             time, and tools used for the job.  upper  upper  upper
                                                                   2-07
                                             GREEN SIDE CHECKLIST FOR ENTERING THE DERRICK   Cabin  Cabin  Cabin
                                             VIA ELEVATOR OR WORKBASKET  2-08  lower  2-09  lower  lower
                                             1) Notify the Driller.  upper  upper  upper
                                             2) Sign in the Derrick Log Book with T-Card #. Print name,   Cabin  lower  Cabin  lower  Cabin  lower
                                                 date and time up on the Red side of the card.  2-10  2-11
                                             3) List all tools to be used for the job in the Log Book and   upper  upper  upper
                                                 on the Red side of the T-Card.  Cabin  Cabin  Cabin
                                             4) The Driller must visually confirm all tools that are to be   2-12  lower  2-13  lower  lower
                                                 used.
                                             5) Ensure that all tools are tethered or secured.  Cabin  upper  Cabin  upper  Cabin  upper
                                             6) Is a JSA required?  2-14  lower  2-15  lower  lower
                                             7) Is a Safety Harness required?   upper  upper  upper
                                             CHECKLIST FOR EXITING THE DERRICK  Cabin  Cabin  Cabin
                                             1) Notify the Driller.   2-16  lower  2-17  lower  lower
                                             2) Ensure that all tools are accounted for.  Cabin  upper  Cabin  upper  Cabin  upper
                                             3) The Driller must visually confirm that all tools have
                                             been returned.  2-18  lower  2-19  lower  lower
                                             4) Remove name, date. time and tools from Red side of  upper  upper  upper
                                                 T-Card. (Grease pencil or white board marker)  Cabin  Cabin  Cabin
                                             5) Sign out log book and close out PTW if job is finished.  2-20  lower  2-21  lower  lower
                                                             upper  upper   upper
                                                           Cabin   Cabin  Cabin
                                                            2-22  lower  2-23  lower  lower
                                                           Cabin  upper  Cabin  upper  Cabin  upper
                                                            2-24  lower  2-25  lower  lower
                                                             upper  upper   upper
                                                           Cabin   Cabin  Cabin
                                                             lower  lower   lower
       SP-2559, 2562, 2567, 2568 & 2569    SP-2585-               SP-1326 -
             - 300mm x 800mm             400mm x 800mm          665mm x 580mm
          Muster & Specific Location   Derrick T-Card Board.  Bunk Allocations Board.
              T-Card Boards.
                                          137
   132   133   134   135   136   137   138   139   140   141   142