Page 137 - Seaward Safety | Supplying Signage Solutions
P. 137
T-Card Boards and T-Cards * All Boards can be tailored
to suit requirements
YOUR WORK PERMIT YOUR WORK PERMIT
LOGO LOGO
HERE IN OPERATION HERE IN OPERATION
Pictographs can be
altered to suit your
requirements.
See pages 77-98.
SSL-056-INT - 630mm x 720mm SSL-056-SS - 630mm x 720mm
Internal Work Permit In Operation Board. External Work Permit In Operation Board.
YOUR WORK PERMIT YOUR WORK PERMIT
LOGO LOGO
HERE IN OPERATION HERE IN OPERATION
SSL-057-INT - 630mm x 550mm SSL-057-SS - 630mm x 550mm
Internal Work Permit In Operation Board. External Work Permit In Operation Board.
MUSTER POINT B
MUSTERED STATUS FIRE STATION
NORMAL STATUS MUSTERED STATUS
YOUR DERRICK
MUSTER POINT A MEDICAL CENTRE COMMAND CENTRE LOGO T-CARD
NORMAL STATUS HERE SYSTEM
NORMAL STATUS MUSTERED STATUS NORMAL STATUS MUSTERED STATUS
YOUR
LOGO BUNK ALLOCATIONS
HERE
upper upper upper
Cabin Cabin Cabin
2-04 lower 2-05 lower lower
INSTRUCTIONS upper upper upper
On the Red side, the person must enter his name, date, Cabin lower Cabin lower Cabin lower
2-06
time, and tools used for the job. upper upper upper
2-07
GREEN SIDE CHECKLIST FOR ENTERING THE DERRICK Cabin Cabin Cabin
VIA ELEVATOR OR WORKBASKET 2-08 lower 2-09 lower lower
1) Notify the Driller. upper upper upper
2) Sign in the Derrick Log Book with T-Card #. Print name, Cabin lower Cabin lower Cabin lower
date and time up on the Red side of the card. 2-10 2-11
3) List all tools to be used for the job in the Log Book and upper upper upper
on the Red side of the T-Card. Cabin Cabin Cabin
4) The Driller must visually confirm all tools that are to be 2-12 lower 2-13 lower lower
used.
5) Ensure that all tools are tethered or secured. Cabin upper Cabin upper Cabin upper
6) Is a JSA required? 2-14 lower 2-15 lower lower
7) Is a Safety Harness required? upper upper upper
CHECKLIST FOR EXITING THE DERRICK Cabin Cabin Cabin
1) Notify the Driller. 2-16 lower 2-17 lower lower
2) Ensure that all tools are accounted for. Cabin upper Cabin upper Cabin upper
3) The Driller must visually confirm that all tools have
been returned. 2-18 lower 2-19 lower lower
4) Remove name, date. time and tools from Red side of upper upper upper
T-Card. (Grease pencil or white board marker) Cabin Cabin Cabin
5) Sign out log book and close out PTW if job is finished. 2-20 lower 2-21 lower lower
upper upper upper
Cabin Cabin Cabin
2-22 lower 2-23 lower lower
Cabin upper Cabin upper Cabin upper
2-24 lower 2-25 lower lower
upper upper upper
Cabin Cabin Cabin
lower lower lower
SP-2559, 2562, 2567, 2568 & 2569 SP-2585- SP-1326 -
- 300mm x 800mm 400mm x 800mm 665mm x 580mm
Muster & Specific Location Derrick T-Card Board. Bunk Allocations Board.
T-Card Boards.
137

