Page 110 - Seaward Safety
P. 110
Operational Boards
YOUR YOUR
LOGO LOGO
HERE HERE
EMBARKATION LIFTING GEAR QUARANTINE AREA
1. Able bodied personnel board lifeboat immediately. Casualties on stretchers are passed inboard
and secured. All passengers put on seatbelts. Helmsman starts the engine.
Do not remove or use equipment
2. The last person to board reconfirms that launching area is clear.
3. All doors and portholes are verified as being closed.
from this area.
White colour coded equipment is
LAUNCHING THE LIFEBOAT Installation for ship-type Installation for platform
1. Make sure that all lifeboat lashings are removed before launching. not yet certified.
2. Pull the control wire in top of the hatch. Pulling down on the control wire lifts the brake and starts
the descent. Releasing it applies the brake and stops the descent.
Red colour coded equipment is
3. The winch has a two-speed lowering system with a hydraulic speed controller. Both the low speed,
which should be used during turn-out of the davit and the high speed used for the descent is fixed
by the hydraulic speed controller and cannot be adjusted by the remote control wire. condemned and is to be destroyed.
During turn-out of the davit a gentle pull should be applied to the remote control wire and the winch
will operate at low speed. When the lowering blocks/hook links leaves the davit head, pull harder on
the wire and the high speed mode will be activated. For more detailed instruction see also the
winch manual. The current certified lifting
4. The boat should be allowed to descend to the water at the automatically controlled speed and equipment colour code is:
splash down. This frees the falls for easy release.
Report all defects to the STC
SP-2314 - 420mm x 297mm SP-2315 - 297mm x 210mm
Lifeboat Launch Instructions. Lifting Gear Quarantine Area.
YOUR YOUR
LOGO LOGO
HERE HERE
PROCEDURE FOR BLOCKED CUTTINGS HOPPER IN CASE OF FIRE
1. Call Drill Floor. Driller to pick up WATER CANNON
off bottom and Decrease pump rate. 1. Open Valve #1 BLUE to Supply Water to Monitors.
2. Call Oiltools Representative. 2. Start ALL Fire Pumps.
3. Call Toolpusher. FOAM CANNON
4. Call Company man. 3. Metered Foam open Valve #2 YELLOW
Note: Vigilance and early warning is the or
best defense against spills. 4. If Valve #2 YELLOW fails open Valve #3 GREEN
SP-2316 - 297mm x 210mm SP-2317 - 297mm x 210mm
Blocked Cuttings Hopper Procedure Board. Fire Procedure Board.
YOUR YOUR
LOGO LOGO
HERE HERE
HELICOPTER PUMPING SYSTEM LINE UP EXPLOSIVES JETTISON PROCEDURE
1. Check all connections on fuel tanks.
1. Remove safety pin at back of locking bolt.
2. Open air supply valve. It is forward between fuel
tanks and air filter system.
3. Open the outlet valve between the air filter system 2. Remove Blue locking bolt.
and the pump.
4. Open final valve on starboard side of pump housing.
3. Turn Red lever right to Jettison.
5. At completion of refuelling ensure all valves are
closed and the fuel hose has been bled off!
SP-2318 - 297mm x 210mm SP-2321 - 420mm x 297mm
Helicopter Pumping System Procedure Board. Explosive Jettison Procedure Board.
110

