Page 110 - Seaward Safety
P. 110

Operational Boards






        YOUR                                    YOUR
        LOGO                                    LOGO
        HERE                                    HERE
              EMBARKATION                          LIFTING GEAR QUARANTINE AREA
      1. Able bodied personnel board lifeboat immediately. Casualties on stretchers are passed inboard
          and secured.  All passengers put on seatbelts. Helmsman starts the engine.
                                                  Do not remove or use equipment
      2. The last person to board reconfirms that launching area is clear.
      3. All doors and portholes are verified as being closed.
                                                  from this area.
                                                  White colour coded equipment is
            LAUNCHING THE LIFEBOAT  Installation for ship-type  Installation for platform
      1. Make sure that all lifeboat lashings are removed before launching.  not yet certified.
      2. Pull the control wire in top of the hatch. Pulling down on the control wire lifts the brake and starts
          the descent. Releasing it applies the brake and stops the descent.
                                                  Red colour coded equipment is
      3. The winch has a two-speed lowering system with a hydraulic speed controller. Both the low speed,
          which should be used during turn-out  of the davit and the high speed used for the descent is fixed
          by the hydraulic speed controller and cannot be adjusted by the remote control wire.  condemned and is to be destroyed.
         During turn-out of the davit a gentle pull should be applied to the remote control wire and the winch
         will operate at low speed. When the lowering blocks/hook links leaves the davit head, pull harder on
         the wire and the high speed mode will be activated. For more detailed instruction see also the
         winch manual.                            The current certified lifting
      4. The boat should be allowed to descend to the water at the automatically controlled speed and   equipment colour code is:
          splash down. This frees the falls for easy release.
                                                    Report all defects to the STC
             SP-2314 - 420mm x 297mm                 SP-2315 - 297mm x 210mm
             Lifeboat Launch Instructions.          Lifting Gear Quarantine Area.
        YOUR                                    YOUR
        LOGO                                    LOGO
        HERE                                    HERE
      PROCEDURE FOR BLOCKED CUTTINGS HOPPER          IN CASE OF FIRE
        1.  Call Drill Floor. Driller to pick up  WATER CANNON
          off bottom and Decrease pump rate.  1. Open Valve #1 BLUE to Supply Water to Monitors.
        2.  Call Oiltools Representative.    2. Start ALL Fire Pumps.
        3.  Call Toolpusher.                  FOAM CANNON
        4.  Call Company man.                3. Metered Foam open Valve #2 YELLOW
        Note: Vigilance and early warning is the              or
        best defense against spills.         4. If Valve #2 YELLOW fails open Valve #3 GREEN
             SP-2316 - 297mm x 210mm                 SP-2317 - 297mm x 210mm
       Blocked Cuttings Hopper Procedure Board.        Fire Procedure Board.
        YOUR                                    YOUR
        LOGO                                    LOGO
        HERE                                    HERE
         HELICOPTER PUMPING SYSTEM LINE UP        EXPLOSIVES JETTISON PROCEDURE
       1.  Check all connections on fuel tanks.
                                              1.  Remove safety pin at back of locking bolt.
       2.  Open air supply valve. It is forward between fuel
        tanks and air filter system.
       3.  Open the outlet valve between the air filter system   2.  Remove Blue locking bolt.
        and the pump.
       4.  Open final valve on starboard side of pump housing.
                                              3.  Turn Red lever right to Jettison.
       5.  At completion of refuelling ensure all valves are
        closed and the fuel hose has been bled off!
             SP-2318 - 297mm x 210mm                 SP-2321 - 420mm x 297mm
      Helicopter Pumping System Procedure Board.  Explosive Jettison Procedure Board.

                                          110
   105   106   107   108   109   110   111   112   113   114   115