Page 111 - Seaward Safety
P. 111
Operational Boards
YOUR
LOGO FACILITY NAME OPERATION STATUS BOARD
HERE
SENSORS / VALVES / PUMPS FIRE & GAS ISOLATION DP CREW ON TOUR
CAPTAIN:
CHIEF MATE:
12 / 12 DPO's:
6 /6 DPO's
BARGE ENGINEER:
SP-4472 - 1870mm x 1270mm
DECK PUSHER
POTABLE WATER PHONE AND CONTACTS Operation Status Board.
ON OFF
PORT
WATERMAKER
STARBOARD
WATERMAKER Dry wiped display board, used for showing the status of
POTABLE
WATER IN USE
VARIOUS ON GOING JOBS INFORMATION
SUBSEA
FIXED TARGET STATUS various operations onboard a facility. This board is
DATE
ENG 1
ENG 2 mounted in a metal snap frame.
DRILL WATER ACCOMMODATION PROBLEM
ENG 3
ENG 4 TANK IN USE
ENG 5 TANK CIRC
ENG 6
FACILITY NAME
YOUR
LOGO BULK STATUS BOARD
HERE
DATE:
Cement Silos (Stbd) FWD Barite / Bentonite Silos (Port) FWD
A B C D Barite C Barite B Barite A Bentonite
3 3 3 3 3 3 3 3
Max 115 M Max 115 M Max 115 M Max 115 M Max 115 M Max 115 M Max 115 M Max 115 M
Sounding: Sounding: Sounding: Sounding: Sounding: Sounding: Sounding: Sounding:
______M ______M ______M ______M ______M ______M ______M ______M
Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
_______M 3 _______M 3 _______M 3 _______M 3 _______M 3 _______M 3 _______M 3 _______M 3
_______MT _______MT _______MT _______MT _______MT _______MT _______MT _______MT SP-4998 - 900mm x 740mm
Grade:_____ Grade:_____ Grade:_____ Grade:_____ Grade:_____ Grade:_____ Grade:_____ Grade:_____
Bulk Status Board.
Day Tank A Day Tank B Barite Surge Bentonite Surge
Max 40 M 3 Max 40 M 3 Max 40 M 3 Max 40 M 3
Sounding: Sounding: Sounding: Sounding: Dry wiped display board, used to highlight the bulk status
______M ______M ______M ______M
Quantity Quantity Quantity Quantity
_______M 3 _______M 3 _______M 3 _______M 3 onboard a facility.
_______MT _______MT _______MT _______MT
Grade:_____ Grade:_____ Grade:_____ Grade:_____
RECEIVED USED ROB RECEIVED USED ROB
TANK (Tonnes) (Tonnes) (Tonnes) TANK (Tonnes) (Tonnes) (Tonnes)
Cement A Bentonite
Cement B Barite A
Cement C Barite B
Cement D Barite C
Day Tank A Bentonite Surge
Day Tank B Barite Surge
Total Cement Tonnes Total Barite Tonnes Total Bentonite Tonnes
YOUR
LOGO FACILITY NAME
HERE
Kill Line Choke Line Top of Top of BOP Test Information
Last BOP Test
Name Ram Type Size RKB to Top Preventer Preventer
of Preventer
to Datum (M) to Datum (FT) Date Pod Used Panel Used
Booster
Next BOP Test
FLEX JT 12.41 40.72
Pod Panel Date
C&K Iso C&K Iso UPP ANN 10.10 33.16 Function Test
Annular Upper Date Pod Used Panel Used
Gas relief valves 6.82 22.40
LOW ANN Shear Rams Test
Shear Ram Last Function date / pressure Next Function date
Upper
USR 4.90 16.12
Lower Middle
Annular
Lower SP-5004 - 1500mm x 1000mm
Upper MSR 4.22 13.87 Diverter System Function Test
Shear Functioned from Next Function date
Upper
Choke
Middle Shear valves LSR 3.64 11.95 Slow Circulating Rates up Riser
SPM Mud Pump 1 Mud Pump 2 Mud Pump 3 Mud Pump 4
Lower Bop Schematics Board.
Upper Shear
Kill valves UPR 2.27 7.46
UPR
Middle
valves Choke MPR 1.84 6.05 Mud weight Mud Viscosity Bit TVD Bit MD
MPR
Lower Kill Dry wiped display board, used to display BOP information
valves Slow Circulating Rates up Choke Line
LPR LPR 1.41 4.63 SPM Mud Pump 1 Mud Pump 2 Mud Pump 3 Mud Pump 4
Lower
Choke valves
DATUM
Mud weight Mud Viscosity Bit TVD Bit MD
Shoe depth Total Drilled Depth
Casing Size MD TVD Hole section size MD TVD
Choke Line Friction Loss
SPM Mud Pump 1 Mud Pump 2 Mud Pump 3 Mud Pump 4
Mud weight Mud Viscosity Bit TVD Bit MD
FIT / LOT of last casing shoe
Surface Maximum
Casing shoe Mud weight pressure allowed mud MAASP
TVD used applied weight
Rig Heading at time of landing on wellhead Well Name Date last Choke & Kill Lines flushed
Date flushed Fluid Used
Date and Time of landing Well Number
General Notes:
111

