Page 112 - Seaward Safety
P. 112
Operational Boards
YOUR YOUR
LOGO MUD PITS / MUD PUMPS STATUS BOARD LOGO SHALE SHAKER HOUSE STATUS BOARD
HERE HERE
Pit 9 Pit 7 Pit 6 Pit 5 Pit 3 Pit 1 Shaker 1 (A) Shaker 2 (B) Shaker 3 (C) Shaker 4 (D) Shaker 5 (E) Shaker 6 (F) Gumbo Desander Desilter
Pit 10 Pit 8 Pit 12 Chem 2 Chem 1 Pit 11 Pit 4 Pit 2
Centrifuge B
SandTrap SandTrap SandTrap SandTrap SandTrap Vacuum
Slug 2 Slug 1 Degasser Tank Desander Tank Desilter Tank Return Tank Degasser
Mud Pump 4 Mud Pump 3 Mud Pump 2 Mud Pump 1 Centrifuges - Holding Tank
Pop-Off set at: Pop-Off set at: Pop-Off set at: Pop-Off set at: Burgess
Degasser
Liner size: Liner size: Liner size: Liner size:
Date last Date last Date last Date last Centrifuge A
flushed: flushed: flushed: flushed:
Notes: Processing Equipment On Off
Degasser Pump
Desander Pump
Desilter Pump
Notes
Trip Tank Pump
Centrifuge A
Centrifuge B
Vacuum Degasser
Burgess Degasser
SP-5005 - 1500mm x 1000mm SP-5006 - 1500mm x 1000mm
Mud Pits/Mud Pumps Status Board. Shale Shaker House Status Board.
Dry wiped display board, used to display the status of Dry wiped display board, used to highlight the status of a
both mud pits and mud pumps. shale shaker house.
YOUR FACILITY NAME OPERATOR
WELL NAME
LOGO WELL NUMBER
HERE PUMPROOM STATUS BLOCK
SPUD DATE
MUD PUMP NO 1 (A) MUD PUMP NO 2 (A) MUD PUMP NO 3 (A) MUD PUMP NO 4 (A)
LINER SIZE LINER SIZE LINER SIZE LINER SIZE
CAPACITY / STK CAPACITY / STK CAPACITY / STK CAPACITY / STK
MAX PRESSURE CYBERBASE MAX PRESSURE CYBERBASE MAX PRESSURE CYBERBASE MAX PRESSURE CYBERBASE
HP RELIEVE VALVE SET POINT HP RELIEVE VALVE SET POINT HP RELIEVE VALVE SET POINT HP RELIEVE VALVE SET POINT
HP RELIEVE VALVE TEST DATE HP RELIEVE VALVE TEST DATE HP RELIEVE VALVE TEST DATE HP RELIEVE VALVE TEST DATE
HP RELIEVE LINE FLUSHED DATE HP RELIEVE LINE FLUSHED DATE HP RELIEVE LINE FLUSHED DATE HP RELIEVE LINE FLUSHED DATE
LP RELIEVE VALVE TEST DATE LP RELIEVE VALVE TEST DATE LP RELIEVE VALVE TEST DATE LP RELIEVE VALVE TEST DATE
PRE-CHARGE PRESSURE PRE-CHARGE PRESSURE PRE-CHARGE PRESSURE PRE-CHARGE PRESSURE
LAST INSPECTION SUCTION LAST INSPECTION SUCTION LAST INSPECTION SUCTION LAST INSPECTION SUCTION
MODULE DATE MODULE DATE MODULE DATE MODULE DATE
LAST INSPECTION DISCHARGE LAST INSPECTION DISCHARGE LAST INSPECTION DISCHARGE LAST INSPECTION DISCHARGE
MODULE DATE MODULE DATE MODULE DATE MODULE DATE
SUCTION STRAINER CLEANED SUCTION STRAINER CLEANED SUCTION STRAINER CLEANED SUCTION STRAINER CLEANED
DATE DATE DATE DATE
DISCHARGE STRAINER CLEANED DISCHARGE STRAINER CLEANED DISCHARGE STRAINER CLEANED DISCHARGE STRAINER CLEANED
DATE DATE DATE DATE
WELL NAME
YOUR FACILITY NAME OPERATOR
LOGO WELL NUMBER
HERE MUD TREATMENT STATUS BLOCK
SPUD DATE
SHAKER 1 (A) SHAKER 2 (B) SHAKER 3 (C) SHAKER 4 (D) SHAKER 5 (E) SHAKER 6 (E) SHAKER 7 (E)
TOP SCREEN TOP SCREEN TOP SCREEN TOP SCREEN TOP SCREEN TOP SCREEN TOP SCREEN
MUD PUMP SELECTION SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH:
MUD PUMP SELECTION MAIN WELL AUX WELL BOOST SHEAR
MUD PUMP NO 1
MUD PUMP NO 2
MUD PUMP NO 3 LOWER SCREEN LOWER SCREEN LOWER SCREEN LOWER SCREEN LOWER SCREEN LOWER SCREEN LOWER SCREEN
SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH:
MUD PUMP NO 4
PERMITS
HIGH PRESSURE LINE SELECTION PUMP ROOM
LINE SELECTION DRILLING STANDBY BOOST SHEAR
SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH: SCREEN MESH:
STANDPIPE NO 1 N/A
STANDPIPE NO 2
CLEAR LAMINATE (FRONT COVER)
BOOST LINE N/A
CENTRIFUGE 1 (A) CENTRIFUGE 2 (B) DEGASSER 1 (A) DEGASSER 2 (B) MUD FLOW LINE UP
STATUS ONLINE TIME: STATUS ONLINE TIME: STATUS ONLINE TIME: STATUS ONLINE TIME: SHAKER ONLINE BYPASS
TREATMENT TANKS ONLINE BYPASS
SUCTION SUCTION SUCTION DESANDER TANK SUCTION DESANDER TANK
CUTTINGS SKIPS DUMP
GUMBO BOX ONLINE BYPASS
TRIP TANK PUMP 1 (A) 2 (B)
DISCHARGE DISCHARGE DISCHARGE DEGASSER 1 (A) DISCHARGE DEGASSER 1 (A) TRIP TANK 1 (A) 2 (B)
RETURN fl. RETURN fl. RETURN DESANDER TANK RETURN DESANDER TANK POORBOY RETURN TRIPTANK SHAKER
SOLIDS CONVEYOR DUMP SOLIDS CONVEYOR DUMP PUMP NO. PUMP NO. CONVEYOR 1 ON OFF PERMITS
RETURN TANK PUMP NO. CONVEYOR 2 ON OFF
CONVEYOR 3 ON OFF
PUMP NO. EM. CONVEYOR ON OFF
LAST LAST LAST LAST
INSPECTION INSPECTION INSPECTION INSPECTION
DATE DATE DATE DATE
DESANDER DESILTER CUTTING DRIER JETTING SYSTEM TANK CLEANING
STATUS ONLINE TIME: STATUS ONLINE TIME: STATUS ONLINE TIME: STATUS ONLINE TIME: STATUS ONLINE TIME:
SUCTION DESANDER TANK SUCTION DESILTER TANK CUTTING SUCTION SUCTION CLEAR LAMINATE (FRONT COVER)
MUD WEIGHT
DISCHARGE DESANDER DISCHARGE DESILTER FLUID DISCHARGE RETURN FUNNEL VISCOSITY
RETURN
RETURN DESILTER RETURN RETURN TANK
SOLIDS SHAKER DUMP SOLIDS SHAKER DUMP
PUMP NO. PUMP NO. REMARKS PUMP NO. PUMP NO.
LAST LAST LAST LAST LAST
INSPECTION INSPECTION INSPECTION INSPECTION INSPECTION
DATE DATE DATE DATE DATE
ECO-SP0006 - 1250mm x 1500mm ECO-SP0007 - 1500mm x 1250mm
Pumproom Status Board. Mud Treatment Status Board.
Dry wiped display board, used to display and record the Dry wiped display board, used to display and record the
status of the mud pumps onboard a facility. Board comes treatment of mud onboard a facility. Board comes
complete with a clipboard holder for permits in operation. complete with a clipboard holder for permits in operation.
112